Registered: 11/17/04
Posts: 167
Loc: Pine Brook, NJ
(65.37.209.215)
Is there a way to have an integration between Job Cost and A/P that would alert me when entering a new vendor invoice in AP - that the additional dollar amount puts the actual job cost over the estimated cost?